Airport terminal interior under an illuminated ceiling

Case study · Aviation

Allama Iqbal International Airport, Lahore

A comprehensive security infrastructure audit of the airport, the first ever carried out to establish how well the newly installed equipment works.

Allama Iqbal International Airport terminal building lit at night
Allama Iqbal International Airport terminal building lit at night
  • 10areas in the audit scope
  • 3security systems audited: intrusion prevention, CCTV and RFID

The project

Establishing how well newly installed security equipment performs, from the entry points to the SOPs.

The brief

Allama Iqbal International Airport, Lahore, needed to establish how well its newly installed security equipment works.

Our role

ITnIS carried out the first-ever comprehensive security infrastructure audit, covering the complete premises and entry points, physical security devices, the intrusion prevention, CCTV and RFID systems, illumination, the security operations center, associated software and SOPs.

First-ever

Security infrastructure audit, Allama Iqbal International Airport

Scope delivered

Security infrastructure audit

  • 01The complete airport premises
  • 02Entry points
  • 03Physical security devices
  • 04Intrusion prevention system
  • 05CCTV system
  • 06RFID system
  • 07Illumination
  • 08Security operations center (SOC)
  • 09Associated software
  • 10Standard operating procedures (SOPs)

Start a conversation

Planning a security audit?

Tell us what you are building or securing. We will arrange a free first consultation with the right specialist.